13
Search and Surveillance Powers
(NZLC R98)
Further
Reform of Habeas Corpus: Refining the Procedure
(NZLC R100)
Eight bills drawing on previous Commission reports became law during
the 2007/08 year, and at year end five bills from previous Commission
reports were in Parliament, and a further eight bills based on previous
reports were being prepared by officials and PCO.
D Advisory work
In addition to our project and implementation work programme,
the Commission continued to be heavily involved in advisory work.
Specific areas where advice was provided during the year are referred
to later in this report. However, much of our advisory work is on
a regular and highly visible basis through the LAC and the LDC,
both chaired by the President. In addition, the Commission frequently
appears in front of select committees, at the committeesf request,
to provide advice on particular issues of legal concern. For example,
the Commission produced an extensive and influential submission from
the LAC and the Law Commission to the Regulations Review Select
Committee on the latter committeefs gInquiry into the Ongoing
Requirement for Individual Regulations and Their Impacth.
The Commission frequently collaborates with departments that are
considering policy changes and improving ways of dealing with issues.
For example, during the year it worked alongside the Ministry
of Economic Development in considering the issues that arose out
of a Memberfs Bill on regulatory responsibility.
It is often the case that departments and Ministers call for assistance
from the Commission on legislative proposals they have under
consideration that involve particularly difficult legal or constitutional
issues. The Commission has available legal expertise that particularly
relates to legislative proposals and the preparation of government
Bills. It has an overview of the entire statute book and can often
provide advice that can place particular legislative proposals in
a wider context.
E Capability development
The Commission made a number of significant improvements in its
corporate systems and project management tools during the year.
In particular, it introduced a new project management planning and
reporting guide. This guide includes our project methodology